Arventa Group

Annual Report 2025ARVNT

Ports, lines, power plants.

Since 1978, Arventa Group has built and run the Aegean’s energy, transport and water infrastructure. Nine companies in six fields, 6,412 people.

Annual Report 2025 (PDF)Our companies

Container cranes at Aliağa Port at dawn
Aliağa Port, February 2025
Two engineers servicing the base of a wind turbine tower
North Aegean wind farm, maintenance crew
A freight train crossing a viaduct over an olive valley
Çandarlı rail link
Evening shift in the grid control room
Grid control centre

Annual Report 2025 · Founded 1978, Izmir · Borsa Istanbul: ARVNT

Group structure

Nine companies in six fields. Hover a company to see its figures and its site.

All companies
A turbine blade on the coastal road

Energy · Founded 2004

Arventa Enerji Üretim

Builds and operates wind and solar plants across the Aegean and Marmara.

Installed capacity
1.240MW
Plants in operation
14plants
2025 generation
3,1TWh
Old olive trees between solar panels
Bergama agrivoltaic plant: panels between the olive rows.

Sustainability

Every facility we build will stay in place for decades. So we measure more than output: emissions, water, safety and the people who live nearby.

Indicator20242025Change
Scope 1 and 2 emissions kt CO₂e412356−13.6%
Renewable electricity share %7184+18.3%
Water reused million m³29,838,2+28.2%
Lost-time injury frequency per million hours1,91,4−26.3%

Independently assured data. Sample content.

Our sustainability approach

Young engineers reviewing drawings on site at dawn

On site, at the port, in the control room: 6 open positions.

We are hiring engineers, operators, planners and interns. The Graduate Engineer Programme rotates you through four companies in two years.

Careers

Investor relations

Ticker
ARVNT
Index
BIST 100
Free float
34.6%
Credit rating
AA (tr)
Investor relations

Financial calendar

  1. Q3 results conference call
  2. Full-year 2026 results
  3. 2026 Annual Report
  4. Annual General Meeting

Offices